What excavation covers
Excavation removes ground to create an agreed space or level. A garden feature, a foundation trench and a larger area of ground reduction require different dimensions, working methods and spoil arrangements, even when they use a similar excavator.
Tell us the result you need rather than choosing a machine first. Where the work follows a designer's or builder's drawings, those dimensions and any inspection stages need to be identified before the excavation is priced.
Plan the space around the hole
The working area includes more than the excavation itself. The machine needs access and room to operate, while excavated soil needs a suitable place to be kept, loaded or removed. A narrow entrance may call for smaller equipment and an additional carrier to move spoil.
Known services, nearby walls, changes in ground and water affect the method. Excavation support and safe working arrangements must be assessed for the actual site; the machine's maximum digging depth is not a statement that every hole can safely be dug to that depth.
Coordinate the next stage
Digging can be combined with suitable material deliveries or an agreed loading and removal operation. Coordinating these stages may avoid a stockpile blocking the work or a delivery arriving before the site is ready, but the actual sequence and availability must be confirmed.
Excavation does not by itself provide engineering design, certify foundation ground or complete the structure that follows. The quotation identifies the finish we are working towards, who provides the specification and which follow-on tasks belong to another trade.
How the job is arranged
- Tell us about the site
Send the dimensions, access photographs and any drawings; mention known services and the intended spoil destination.
- Assess the work
We assess access, proposed equipment and the information still needed. A site visit or specialist input may be required before a firm quote.
- Agree the quotation
Agree the scope, operator, transport, spoil handling, price and any inspection or handover points before booking.
- Carry out the agreed scope
Carry out the agreed excavation, with unforeseen ground conditions or changes referred back for agreement before additional work.
Questions about this service
Can you dig footings for an extension?
Send the supplied foundation layout, dimensions and any required inspection stages. Excavation can be assessed against that brief; foundation design, ground approval and concrete work are not assumed included.
Can the soil stay on site?
Tell us where it could be placed and what you intend to use it for. Space, suitability and the effect on the rest of the job need checking; retaining soil is not automatically the best or an acceptable option.