Southampton · Portsmouth · HampshireUrgent delivery? Explore express options →
Home/Loose loads/Crushed rubble 6F5 80mm
Crushed rubble 6F5 80mm — representative image

Crushed rubble 6F5 80mm

A fill material for the specific layer and construction design on your project.

PRICE WITH DELIVERY
Request a delivered quote

We’ll confirm the price for your postcode.

Urgent delivery or restricted access

Express delivery: by arrangement. Any quoted supplement is shown net + VAT and including VAT; a selected 3.5t express supplement is included in the displayed guide total.

See delivery price details

Typical uses

  • Specified groundworks
  • Suitable fill layers
  • Site preparation
How to use this material ↓
Supply formatLoose tipped load
Order unitLoose, priced per tonne
Nominal grading80mm
DeliveryStandard or compact vehicle request
Urgent deliveryBy arrangement

Crushed rubble 6F5 80mm for your project

Coarse recycled 6F5 fill

6F5 crushed rubble is a coarse recycled aggregate, listed here in an 80mm grade. It is intended for suitable bulk fill or capping work rather than a neat decorative finish.

Capping and substantial level build-up

It may be used in substantial ground preparation where the design accepts 6F5. Explain the intended layer, finished levels and expected loading when requesting supply.

The coarse particles affect how the material is placed and compacted. Have the contractor specify layer thickness and equipment rather than treating it like a thin spread of gravel.

A different layer from fine sub-base

6F5 is not automatically a replacement for the Type 1 layer nearer a finished surface. A project can need both materials in different positions.

Because it is recycled, confirm the current composition, grading and product documentation for the job. Do not infer suitability for drainage, planting or direct contact with membranes from the label alone.

Planning a loose delivery

Loose delivery is quoted by the tonne. Provide the area, designed layer thickness and intended compaction; the final order should reflect the supplied material rather than equating one tonne with one cubic metre.

Before you book

How do I work out the quantity?

Measure the length, width and intended depth. Send these measurements with the intended use; bag coverage varies with material density, moisture and any compaction.

Can it be delivered tomorrow?

Ask for next-day availability with your postcode. We confirm stock, transport and access before accepting a delivery date; same-day requests should be made by phone.

What does the price include?

Your quotation will show the material quantity, transport, VAT and any access-related charges. No universal delivered loose-load price is assumed.

Can you work around a restricted entrance or urgent deadline?

Tell us your access width and when you need the delivery. We can check vehicle and timing options; urgent delivery is by agreement and any additional charge is confirmed first.

Call TerraRequest a quote