Fill sand for your project
Sand for an agreed fill layer
Fill sand is supplied for suitable filling and level-building work. It should be ordered by the requirements of the layer, rather than treated as a masonry or finishing sand.
Level build-up where the design permits
It can be considered where the design specifically allows sandy fill. Tell us whether the material is below landscaping, around a service or part of another groundworks detail.
Request the required grading and compaction information from the contractor before ordering. The word fill does not establish a structural performance or a standard recipe.
Not a substitute for every sand
Do not assume it is suitable for bricklaying, plastering, concrete, a play area or pipe bedding. Those applications can require a different declared sand product.
Plan the volume from the finished levels and layer thickness. Any conversion into tonnes should use information for the actual supplied sand, rather than a fixed number for all soils and aggregates.
Planning a loose delivery
Loose delivery is quoted by the tonne. Provide the area, designed layer thickness and intended compaction; the final order should reflect the supplied material rather than equating one tonne with one cubic metre.
Before you book
How do I work out the quantity?
Measure the length, width and intended depth. Send these measurements with the intended use; bag coverage varies with material density, moisture and any compaction.
Can it be delivered tomorrow?
Ask for next-day availability with your postcode. We confirm stock, transport and access before accepting a delivery date; same-day requests should be made by phone.
What does the price include?
Your quotation will show the material quantity, transport, VAT and any access-related charges. No universal delivered loose-load price is assumed.
Can you work around a restricted entrance or urgent deadline?
Tell us your access width and when you need the delivery. We can check vehicle and timing options; urgent delivery is by agreement and any additional charge is confirmed first.


