Typical jobs
- Carry out bulk excavation on open construction sites.
- Excavate major foundations and deeper drainage runs.
- Load sustained volumes of spoil into haulage vehicles.
Choosing your 20–24t tracked excavator
For sustained excavation
A 20–22-tonne-class tracked excavator is intended for considering substantial ground reduction, larger foundations, infrastructure drainage and loading operations. Its value comes from matching the machine to the material volume and the transport cycle, not simply selecting the largest available digger.
Explain how much material needs to move and where it will go. A loading area, suitable haulage and room for vehicles to turn are part of the job; a large excavator waiting for an undersized spoil-removal operation cannot deliver its intended productivity.
Bucket and reach selection
The Volvo EC210 reference has different bucket and operating-weight configurations. Dense excavated ground and lighter loose material may require different bucket choices. Reach and maximum digging depth depend on the selected boom, arm and working arrangement.
Working area and limits
The nominal class is not a 21-tonne lifting rating. Any pipe, chamber or other suspended load needs a separate check of weight, reach, attachment and machine lifting data. Adequate room for the rear of the machine, the bucket and the loading vehicle is essential.
Compare the 13–14-tonne class when the excavation or working footprint is smaller. A wheeled excavator may be a better option for frequent movement over prepared surfaces. Delivery, unloading and ground support need checking before this class is proposed for a confined plot.
Define the package and sequence
Tell us whether the work is digging, grading, breaking or a combination. Bucket sizes, specialist hydraulic attachments and any lifting equipment are confirmed separately. Provide drawings or excavation dimensions, known obstructions and the planned muck-away or material-placement sequence.
Hire and quotation
Your delivered hire quotation includes the agreed machine, attachments, hire period, delivery and collection. Exact availability and configuration are confirmed before booking. Fuel, any operator and insurance requirements are agreed separately. Express delivery is available by arrangement with a surcharge confirmed before booking.
Example specification: manufacturer information ↗. Delivered specification confirmed in your quotation.
Before you book
Can I hire it without an operator?
Self-drive may be arranged subject to the supplier accepting your competence, site and insurance arrangements. Ask for an operated quote if you need someone to carry out the work.
What is included in the hire price?
The delivered hire quotation includes the machine, agreed attachments, hire period, delivery and collection. Fuel, any operator, deposits and insurance terms are agreed separately before booking. Express delivery is available by arrangement; any surcharge is confirmed before you book.
Will this exact model be delivered?
The model shown illustrates the class. We confirm the actual model and important dimensions before you commit.
Can you work around a restricted entrance or urgent deadline?
Tell us your access width and when you need the delivery. We can check vehicle and timing options; urgent delivery is by agreement and any additional charge is confirmed first.



