The base supports the finished surface
Base preparation creates the agreed ground and aggregate layers beneath a finished surface or working area. Excavation, material selection, placement and compaction have to suit what the area will be used for; a footpath and a vehicle route do not share one automatic specification.
Tell us the final surface and expected use before selecting an aggregate. A visible layer of stone is not by itself proof of a suitable driveway, shed foundation or permeable construction. Any required design or product installation detail needs to be part of the brief.
Define the layers and finish
The quotation can identify excavation, separation material where specified, aggregate delivery, placement and the agreed compaction stage. Layer thickness, material and equipment are selected for the supplied specification rather than copied from a generic online example.
The finished base must also relate to the later surface level, edging and intended drainage arrangement. For front-garden paving or a new access, check any applicable permission and drainage requirements before work is commissioned. These are not automatically resolved by supplying aggregate.
Coordinate supply with preparation
A material delivery arriving after excavation but before compaction can fit the work sequence better than an early stockpile occupying the access. We can consider the machinery, operator and material movements in one enquiry, with actual delivery slots and availability agreed.
If you only need the base, the quote can end at a clearly described handover point for the paving or building contractor. Weak ground, buried structures or unexpected water may change what preparation is needed and should be reviewed before adding work or materials.
How the job is arranged
- Tell us about the site
Send the area, proposed use, final surface and any design or installation specification, together with site photographs.
- Assess the work
We review excavation, access, materials and the information needed to confirm the base arrangement.
- Agree the quotation
Agree the layers, levels, compaction scope, spoil destination and handover to any surfacing contractor.
- Carry out the agreed scope
Carry out the specified preparation stages; unexpected ground or a change in specification is discussed before extra work.
Questions about this service
Is a standard layer of Type 1 enough?
Not for every application. The required material and thickness depend on the ground, loads, final surface and drainage design. Send the intended use and specification so the preparation can be assessed.
Does this include the finished driveway or patio?
Only if it is separately included in the agreed scope. The base-preparation service can stop at the defined level ready for the next contractor or stage.